Grilling & Recipes: Suggestions?
(Lake Martin Specific)
111,143 messages
Updated 4/25/2024 7:30:23 PM
Lakes Online Forum
83,605 messages
Updated 4/25/2024 9:33:24 PM
Lakes Online Forum
5,193 messages
Updated 4/3/2024 3:47:36 AM
(Lake Martin Specific)
4,169 messages
Updated 4/16/2024 3:16:57 AM
Lakes Online Forum
4,169 messages
Updated 4/15/2024 11:05:05 PM
Lakes Online Forum
4,260 messages
Updated 3/24/2024 9:24:45 AM
Lakes Online Forum
2,976 messages
Updated 3/20/2024 11:53:43 PM
(Lake Martin Specific)
169 messages
Updated 5/31/2023 1:39:35 PM
Lakes Online Forum
98 messages
Updated 4/15/2024 1:00:58 AM
|
|
|
Here is a picture in progress. First we reinforced the joists and sloped the framing while doing so.Then primed 3/4 inch tongue and grove plywood was screwed down. plywood was covered with roofing felt. 5/8" Durock was layered over felt and screwed down. Joints were taped and a layer of thin set was added. Thin set was painted with a rubber type coating made for tile wet areas and showers (providing a water tight barrier). Tile was set directly on the coating and grouted.
Below is the finished product
|
|